SpectrumTalk has moved!

25th Anniversary of FCC Decision Enabling Wi-Fi and Bluetooth

25th Anniversary of FCC Decision Enabling Wi-Fi and Bluetooth
A series of posts describing how this all came about. (Click on picture above)
Showing posts with label white space device. Show all posts
Showing posts with label white space device. Show all posts

Friday, January 25, 2008


TV White Space Device Testing Off and Running


Yesterday at 10 AM a crowd of about 30 gathered at the FCC Lab in Columbia Maryland to watch the beginning of Phase 2 of the Docket 04-186 White Space Device testing. Four devices are being testing: Adaptrum, Microsoft, Motorola, and Philips. Some are detectors only, some are both detectors and transmitters.

It was announced that a fifth unit from Singapore Institute for Infocomm Research (I²R - pronounced "i-squared-r") was on the way from Singapore for testing but had a shipping hangup with DHL that had trouble posting a bond for reexport with US Customs and shipped the unit back to Singapore. I²R is now using a different shipper and arrival is expected shortly.

The Google prototype is missing in action without any explanation and FCC staff was vague about whether additional units would be accepted - implying that this was subject to the Chairman's usual micromanagement.

It was announced that testing schedule updates would be posted on the testing web site.
[But no information has actually been posted to date. I was amused to hear that in the current FCC micromanagement environment, the Chairman's Office approval was needed for OET to post information to this site and had been obtained.]


As I speculated in the previous post, different developers got different guidance from the FCC staff on what interfaces from the devices were requested to speed testing. Philips was told to indicate the results of 30 trials to detect a given frequency and interpreted to give a percentage of the tries that indicated the frequency was in use. Adaptrum was asked more specifically to deliver a text string of zeroes and ones indicating the outcome of each trial. I suspect this inconsistency comes from the inability of FCC staff members to issue written guidance on even such microscopic matters without multiple layers of oversight - so they just issue inconsistent verbal guidance.



When the testing started the 30 observers gathers in a lab room and watch initial testing of the Philips units with undistorted DTV signals from a Rhode and Schwarz signal generator fed directly into their device. Testing started at -110 dBm and reach -120 dBm when we broke for lunch. At that point the Philips device still had a perfect detection record.



MSTV observers repeated questioned whether devices might just always declare a signal was present to get a perfect record. Apparently MSTV has no faith in market forces since such a device would fail in the market as it would never transmit a signal and also never cause interference. MSTV also quibbled whether smaller antennas might make detectors less sensitive. While this is true in a technical sense, it is irrelevant for policy consideration since the FCC proposal, the position of most parties, and the 5 GHz U-NII precedent deals with system performance not just the detector electronics: if the
total system doesn't meet the performance standard in the final rule, if can't be sold.



The initial testing also revealed the ambiguities in the published test plan. The first test, I.A, was testing detection at various DTV signal levels. The procedure actually used was to use a Rhode & Schwarz SFU signal generator to directly produce signals at levels in the -110 dBm range (much more sensitive than DTV receivers) and below and to send them by cable to the equipment under test (EUT) a few feet away. There are lingering doubts whether the signal reaching the nearby EUT in such a setup are actually the power indicated on the SFU since at such very low signal levels unintended paths might create comparable signals. Oddly, a nearby screen room was not used for this test and would have decreased uncertainty about unintended coupling. The test plan did not address this level of detail.



Indeed, it is puzzling why all this testing is necessary: In the 5 GHz case, NTIA and FCC determined 2 pairs of detection levels and maximum transmit power that would protect the cochannel radar systems and left it to industry to develop systems that met the standard. Truly a pass/fail system. The existence of such a rule would stimulate capital formation to finance the development of such systems while reliably protecting the few homes that receiver over-the-air TV reception. The current lingering uncertainty about what the standard is and the confusion of that issue with prototype testing is a big disincentive to capital formation - something I would have thought a Republican administration would understand.



At the birth of Wi-Fi and Bluetooth in Docket 81-413 many parties of vested interests quibbled over whether affordable electronic could be built to meet the rules. Wisely the Commission chose a fail/safe approach of adopting a standard that protected other systems and just waited to see if anyone could build equipment. Within 2 years the first commercial product reached the market from a startup firm and several years later 802.11 standardization began. Now that Wi-Fi and Bluetooth are household names, few remember the uncertainties of the 1980s.

Sunday, January 20, 2008












White Space Device Testing
to Start at FCC Lab



A January 17th FCC public notice announced the beginning of the next round of testing of prototype white space devices (WSDs) on January 24 at 10 AM and will continue "4 to 6 weeks". the testing will be "conducted openly and transparently" although few details were given about procedures in the published test plan.

The notice indicated that devices from Adaptrum, Microsoft, Motorola and Philips would be tested but was ambiguous about whether late entries would be allowed. Google is thought to have a device also so we will see if they show up and will be allowed to participate with others.

Other unanswered questions about the testing include: What is the last date, if any, that developers can change the software in their prototypes? When can the developers show FCC staff how to operate the devices? FCC staff has informally told developers what type of data they want from the devices during test, e.g. a comma separated variable (CSV) list of yes/no detections for 30 consecutive trials at a given power level. Have all developers been told the same set of requirements?

So the restaurant business near the FCC Lab should pick up for the next few weeks. Hope they plow the parking lot for the expected guests. See you there!

Friday, December 07, 2007


Google white space device prototype

Busy Week of White Space Action


It's been a busy week here in Washington, my home town. Down at the lab of our local communications commission there have been all sorts of visitors, like Magi at Xmas time, bearing gifts or promises of gifts. Fortunately, unlike the advocates of the status quo for large affluent TV broadcasters who skirt the Commission's ex parte rules with apparent impunity, these visitors believe in and act in the letter and spirit of transparency. Thus there is a paper trail where we can follow the action.

Actually, a little earlier on November 16 Motorola came by with the first recent present. Motorola described it as follows
"(It) uses geo-location database that is augmented by sensing algorithms to determine which TV White Space channels are available for use. The device also can be configured to perform testing of the DTV sensing algorithms but is not a normal operational mode of the device."
No pictures were included, but I saw the device at the Lab and it is rack mounted in an 18" high rack.

On December 4, Google dropped by.
(The) Google representatives demonstrated broadband spectrum sensing technologies that reliably detect DTV signals well below the noise floor. The broadband DTV sync signals gave reliable power level estimates, even when the pilot is deeply faded, removing the need for large margins. preliminary figures from the initial phase of the testing support an average sensitivity of -120 dBm.
The picture at the top of this post was included in their submission to FCC.

Then on December 5, Adaptrum, Inc , a client of mine, dropped by with its unit.


Dr. Haiyun Tang of Adaptrum and Steve Jones of FCC Laboratory with Adaptrum White Space Device (WSD) at delivery to FCC for testing,

Adaptrum said in its filing
The Adaptrum device is different from others that have been discussed on the public record in that it is not based frequency domain processing and threshold detection of DTV pilot tone power. Rather, it uses the whole 6 MHz of the DTV signal and contains a time domain matched filter. This greatly increased bandwidth permits greater sensitivity than pilot tone detectors.
Note that the Google and Adaptrum filings were made almost simultaneously and that both systems appear to use the same type of time domain processing.

Also on December 5, my former boss, Ed Thomas, met FCC downtown on behalf of both Microsoft and Philips. The filing says

During this meeting, Mr. Thomas made arrangements for Microsoft and Philips to submit devices to OET for the next round of white space prototype testing, and the parties discussed white space testing logistics, including potential dates for laboratory and field tests.
Are Microsoft and Philips now combining forces and working on a common device? The letter is ambiguous so we will see.

FCC staff reports that the "8th Floor" has now said that all submitted devices will be tested in parallel and publicly with observers from the interested public - please don't throw peanuts at the FCC staff. This apparently includes both bench tests and field tests. A problem appears to be how to find homes to test these in where an unlimited number of observers can wander in and out. Stay tuned.
Subscribe in a reader